Po shfaqen postimet me emërtimin Rehab Work. Shfaq të gjitha postimet
Po shfaqen postimet me emërtimin Rehab Work. Shfaq të gjitha postimet

Beech St. Remodel














































House on 4th






The floorplan of this house is layed out in a row, with the front living room leading right into the dining room, then into the kitchen, finally the back living room and out to the back breezway. Therefore, it was important to consider the views from all vantage points.





The kitchen is the middle room of the row layout and would naturally be the heart of the home, so I chose a rich wine color that really grounds the space and blends into the highly patterned floor tile which adds life and drama.




The one window in this small bath (which was built from an empty nook) faces south letting in a great amount of light all day long. I took advantage of this by painting the walls a dark rich chocolate color, contrasted by even darker cabinets and white porcelain fixtures.





This upstairs is so small there was barely room for the seat. I kept things light and spa-like with subtle green accents. Not seen is the shower (opposite the toilet) which continued the sage green tile from the floor and was finished with the texture of a white weave-quilted curtain.





All the floors were stripped and refinished. And the bedrooms upstairs were painted a light airy color with white trimwork throughout.

Rental on High


The orange spice paint in the kitchen provides a punch of color,
and also acts as a focal point that balances the red brick fireplace.




1) Orange spice color juxtaposed with the white cabinets is very fresh and crisp.
2) Ceramic tile throughout kitchen and bath. Manufactured by Florida Tile.
3) Upstairs alcove with red brick and unique window.


4) Upstairs loft. Suitable for a bedroom.
5) Soft, serene color in small bath.

House on 3rd

This two bedroom, one bath home located in Marion Village was my first freelance project. The entire demolition, construction, and finalization was completed in just under four weeks.

The main wall in the once very small kitchen was torn out to create a much bigger and open kitchen and dining experience. Paint colors and materials were selected as well as staging the house for resale.


Before








The bathroom was completely gutted and all the fixtures were replaced as well as painting the tub, and adding porcelain tile to the floor and shower.


Bedroom color scheme